8-10 Dover Street, W1

Main Contractor: Edenbooth Limited (Phase 1)
Value of Works: £965k

Overview:

These works in Mayfair, involved dropping the existing basement slab of the Dover Street Wine Bar which extended under four separate blocks, by up to 1.50m to become the new MNKY HSE Restaurant. It required extensive temporary works design and installation to support the existing 5-7 storey office and residential blocks above.

Scope of Works:

Demolition and strip out; Temporary Works design; Temporary Works installation/removal; Hydraulic jacking; Piling works and attendances; Underpinning – mass concrete; Bulk excavation and disposal; Underground drainage; Installation of pump chambers; Substructure concrete works; Formwork; Reinforcement; Structural steelwork.


Programme period: 26 weeks
Completion date: Oct 2016